Emerson Network Router Network Router User Manual


 
Installation and Use Manual 75
Meter Verification
Meter Verification Transmitter TerminalsData LoggerTransmitter Configuration
This report contains all the information supplied in the Test Definition panel, as well as information
about the meter's configuration and operating conditions during the test. It indicates:
If the meter has passed or failed the meter verification test
If the Configuration Changed indicator was activated
If the Zero Changed indicator was activated
The number of meter verifications that have been performed on this meter
In addition, the graph showing the current and previous test results is included.
From this panel, you can:
Print the report
Save the report to a file
Save test results to the meter verification test database
Discard test results
To print the report, click
Print Report. The report is sent to the default printer defined in your
computer's system settings.
To save the report, click
Save Report. It will be saved to disk as an HTML file, using the file name
and location that you specify.
Note: The Save Report button allows you to save the displayed report, but it does not save the test
data. To save the test data, you must click Finish as described below.
To save test results to the meter verification test database and close the Meter Verification dialog,
click
Finish. The test results will be saved in a database on the computer on which ProLink II is
installed.
To discard current test results and close the Meter Verification dialog, click
Cancel. The results of the
current test will be discarded and will not appear on the graph in subsequent meter verification tests.