GE 90-30 PLC Switch User Manual


 
1
1-5
GFK-1084B Chapter 1 Introduction
Quick Guide to the Manual
The table below breaks down the tasks shown in Figure 1-2 and identifies where in the
manual they are described.
Tasks Where to go in the Manual
Installing the Interface Chapter 2. Installing the Ethernet Interface
Procedure 1. Installing the Interface
Configuring the Interface Procedure 2. Configuring the Interface
Powering-up the PLC Procedure 3. Verifying Proper Power-Up
Operation of the Configured
Interface
PING Application Connection Tests Procedure 4. Pinging the TCP/IP Inter faces
on the Network
PLC Ladder Programming (COMMREQ) Chapter 3 Programming Communications Requests
Troubleshooting the Interface on
the Network
Chapter 4. Troubleshooting