Promise Technology NS2300N Network Card User Manual


 
Chapter 5: PASM
111
Setting up a UPS
To set up a UPS:
1. Attach the APC UPS to one of the SmartStor’s USB ports.
2. In the Tree, click the + beside the Management icon.
3. Click the APC UPS icon.
4. Click the Setup tab.
The Setup tab enables you to tell the SmartStor how and when to shutdown
after a power failure.
Click the option button beside the shutdown option you want:
Disable (the SmartStor runs until the UPS battery is depleted)
Shutdown when the UPS reaches a set percentage of reserve power
Shutdown after running on the UPS batteries for a set number of
minutes
5. Optional. If you chose battery percentage, type a percentage amount in the
% field.
6. Optional. If you chose remaining runtime or running on batteries, type the
number of minutes into the Mins. field.
7. Click the OK button.