2-1
CHAPTER
2-CHAPTER
Hardware Installation
This chapter describes the hardware installation procedures for the Netra CP3260
blade server, and contains the following sections:
■ Section 2.1, “Equipment and Operator Safety” on page 2-1
■ Section 2.2, “Materials and Tools Required” on page 2-3
■ Section 2.3, “Preparing for the Installation” on page 2-3
■ Section 2.4, “Installation Procedure Summary” on page 2-4
■ Section 2.5, “Configuring On-Board Hardware” on page 2-5
■ Section 2.6, “Installing an Advanced Rear Transition Module (Optional)” on
page 2-18
■ Section 2.8, “Connecting External I/O Cables” on page 2-23
2.1 Equipment and Operator Safety
Refer to Important Safety Information for Sun Hardware Systems (816-7190) for general
safety information.
Read the safety statements specific to the Netra CP3260 blade server carefully before
you install or remove any part of the system.
Caution – Depending on the particular chassis design, operations with open
equipment enclosures can expose the installer to hazardous voltages with a
consequent danger of electric shock. Ensure that line power to the equipment is
disconnected during operations that make high voltage conductors accessible.