Toshiba 4200FA Power Supply User Manual


 
4200FA Installation and Operation Manual i
TABLE OF CONTENTS
TABLE OF CONTENTS ..................................................................................................... i
List of Tables .................................................................................................................. iv
Table of Figures ............................................................................................................... v
1 GENERAL SAFETY INSTRUCTIONS ....................................................................... 1
EQUIPMENT WARNING LABELS .................................................................................................. 2 1.1
IMPORTANT SAFETY INSTRUCTIONS ........................................................................................ 5 1.2
2 INSTRUCTIONS IMPORTANTES CONCERNANT LA SÉCURITÉ ........................... 8
3 Product Description ................................................................................................. 9
Theory of Operation ........................................................................................................................ 9 3.1
Application and Use ........................................................................................................................ 9 3.2
Power Backup ................................................................................................................................. 9 3.3
Power Conditioning ......................................................................................................................... 9 3.4
4 Product Unpacking / Inspection / Storage / Disposal ........................................... 11
Unpack the Premium 15/25/30 kVA UPS (with Casters) .............................................................. 11 4.1
Unpack the Base and Seismic model 15/25/30 kVA UPS (without Casters) ................................ 12 4.2
Unpack the Premium 50 kVA UPS (with Casters) ........................................................................ 13 4.3
Unpack the Base and Seismic 50 kVA UPS (without Casters) ..................................................... 14 4.4
Inspect UPS equipment After Unpacking: ..................................................................................... 15 4.5
Permanent Anchoring for Premium 15/25/30/50 kVA UPS (with Casters) ................................... 15 4.6
Permanent Anchoring for Base and Seismic model 15/25/30/50 kVA UPS (without Casters) ..... 16 4.7
Storage of UPS equipment ........................................................................................................... 17 4.8
Disposal ......................................................................................................................................... 17 4.9
5 Installation Precautions ......................................................................................... 18
Equipment Placement ................................................................................................................... 18 5.1
System Preparation (Pre-Power) .................................................................................................. 19 5.2
Operating Precautions .................................................................................................................. 19 5.3
6 UPS Connections .................................................................................................... 20
Power Connections ....................................................................................................................... 20 6.1
6.1.1 Power Connections 15/25/30 kVA with Internal Batteries ....................................................................... 20
6.1.2 Power Connections 15/25/30 kVA with Internal Transformer .................................................................. 20
6.1.3 Recommended Wire Size and Torque Requirements for 15/25/30kVA ................................................... 21
6.1.4 Power Connection Cable Routing and Conduit Placement 15/25/30 kVA ............................................... 24
Control Circuit and External Battery Interface Connections 15/25/30 kVA ................................... 25 6.2
6.2.1 Recommended Wire Size and Torque Requirements ............................................................................. 27
Power Connections 50 kVA ....................................................................................................... 27 6.3
6.3.1 Recommended Wire Size and Torque Requirements for 50kVA ............................................................. 29
6.3.2 Power Cable Routing and Conduit Placement 50 kVA ............................................................................ 31
Control Circuit and External Interface Connections 50 kVA ......................................................... 32 6.4
6.4.1 Recommended Wire Size and Torque Requirements ............................................................................. 34
Remote Contact ............................................................................................................................ 35 6.5
RemotEye III .................................................................................................................................. 36 6.6
RS-232C ........................................................................................................................................ 36 6.7