ADTRAN 25 Network Card User Manual


 
INSTALLATION
Install TAE, 617A Panels, and Fanning Strips
To install this equipment, proceed as follows:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
For each RJ21X, RJ2GX, and RJ48X
700A Jack 1/2-inch from the edge of
switch cabinet(s).
Mount the first 617A Panel.
network interface, install one
the backboard closest to the
Position and mount the first 50A Fanning Strip next to the 617A
Panel. The edges should overlap so that the same screws will go
through the overlapping key slots in the 50A Fanning Strip and the
617A Panel. The bottoms of the fanning strip and panel are flush.
If required, mount a second 50A Fanning Strip above the first.
Mount the first 10B Emergency Transfer Unit (ETU) in the position
shown in Figure 2-16 or Figure 2-17. Overlap the edges of the ETU
and the panel so that the same screws will go through the
overlapped key slots.
Mount the remaining 617A Panels. Overlap the panels to conserve
space and to reduce the number of screws required; however, do
not mount more than three panels on either side of the 50A Fanning
Strip.
If required, install the second ETU above the first.
If additional ETUs are required, install them close to the 700A Jacks
(Figure 2-1 6). If the alternate SIP arrangement (Figure
install additional ETUs above the second ETU.
Using a felt-tipped pen, letter the adapter columns (A
the 617A Panels, starting with the left side. For
arrangement, start with the left side on the lower row.
Using a #12 AWG ground wire, connect the ground
2-17) is used,
through J) on
the alternate
points on the
ETUs (screw terminal on the upper left side) and link them to the
single-point ground.
Install D rings as required below the 700A Jacks and 617A Panels.
2-44