INSTALLATION
●
Attach cable labels to the two octopus cable 25-pair connectors and
flag-type tie wrap.
●
Attach octopus cables to the 853B adapter
●
Run the cables to the 50A Fanning Strip.
●
Plug the cable ends into the appropriate adapters, and complete the
Voice and Data Station Records Form.
November 1995
2-74a