Installing Modules
Page 2-9
Installing Modules
Up to eight IntraChassis modules can be installed in the IntraChassis 9000
chassis, in addition to the Management Engine module, which is pre-installed
in the factory.
Before installing any modules, make sure the cable guides have been installed, as
explained in the previous section of this chapter.
To install any combination of 2-port Gigabit Ethernet Switch (GBIC) modules
and 24-port 10/100 Switch modules, use the following procedure.
▲ Important: Make sure the IntraChassis 9000 chassis is
properly installed in an equipment rack or resting on a flat,
stable surface capable of supporting 150 pounds (68.2kg).
Also make sure the power cord for the power module is dis-
connected for initial installation.
1 Pull the small ejector lever on each end of the module’s face
plate out, away from the face plate.
2 Align the bottom of the module with the rails on the inside
of the chassis slot where you want to install the module, as
shown in Figure 2-2.
3 Slide the module into the slot until it stops, then push the
module in gently until it seats with the connector.
GLXY9.book Page 9 Thursday, February 17, 2000 3:04 PM