2. Installation
DANGER
Embroider
y
machines should be installed onl
y
by trained engineers.
Electric wiring should be laid by your
distributor or electric experts.
Install a machine in a place away from a high-
fre
q
uenc
y
weldin
g
machine or other machines that
may generate a strong electric noise. Failure to
do so may cause the embroidery machine to
malfunction.
The sewing machine weighs approximately
700 kg.
The installation should be carried out by four
or more people.
Be sure to connect the ground. If the ground
connection is not secure, you run a high risk of
receiving a serious electric shock, and problems
with correct operation may also occur.
Do not connect the power source until
installation is completed. Doing so may start
the machine unintentionally through an
accidental activation of the START switch,
resulting in bodily injuries.
Secure the machine with the adjustment bolts on
the sound floor so that it will not move.
After installation is completed, get the power supply from a dedicated outlet.
When connecting multiple machines, exercise care not to exceed the capacity of the outlet.
2-1 Transportation of Machine
When relocating the machine, push the steel frame. Never push the cover or carriage.
!
!!
! When using a fork lift
W1222Q
1. Viewing the machine from the back, position their center at the central seal, insert the forks under
the legs and lift the machine.
The central seal
Lift forks