Cisco Systems 2960 Computer Hardware User Manual


 
3-13
Catalyst 2960 Switch Hardware Installation Guide
OL-7075-05
Chapter 3 Switch Installation (8-Port Switches)
Installing the Switch
Step 4 Attach the screw template to the wall.
Step 5 Use a 0.144-inch (3.7 mm) or a #27 drill bit to drill a 1/2-inch (12.7 mm) hole in the three screw
template
slots.
Step 6 Insert three screws in the slots on the screw template, and tighten until they touch the top of the
screw
template.
Step 7 Remove the screw template from the wall.
Step 8 Place the switch onto the mounting screws, and slide it down until it locks in place, as shown
in
Figure 3-6.
Figure 3-6 Installing the Switch On a Wall
After the switch is mounted on the wall, do these tasks to complete the installation:
1. Power on the switch. See the “Verifying Switch Operation” section on page 3-6.
2. Connect to a 10/100 or 10/100/1000 port, and run Express Setup. See the switch getting started guide
for instructions.
1 Switch 3 Slides on this way
2 Screw
3
1
2
2
2
157829