SCE 2000 4xGBE Installation and Configuration Guide
OL-7824-02 7-1
This chapter describes how to start up the SCE 2000 platform, reboot, and shutdown. It also
describes how to manage configurations.
This chapter contains the following sections:
• Starting the SCE 2000 Platform 7-1
• Managing SCE 2000 Configurations 7-4
• Performing Complex Configurations 7-10
• Rebooting and Shutting Down the SCE Platform 7-11
Starting the SCE 2000 Platform
The procedures for starting the SCE 2000 platform are explained in the following sections:
• Checking Conditions Prior to System Startup (on page 7-1)
• Starting the System and Observing Initial Conditions (on page 7-2)
Checking Conditions Prior to System Startup
Check the following conditions before you start your SCE 2000 platform:
• Both power supply units are installed and connected
• First-time startup at installation:
• SCE 2000 platform connected to local console (CON port)
• The console terminal is turned on and properly configured
• Subsequent startups
• Line and Cascade interfaces are properly cabled (optional)
• SCE 2000 platform is connected to at least one of the following types of management
stations:
• Direct connection to local console (CON port)
• Remote management station via the LAN (Mng port)
CHAPTER 7
Basic SCE 2000 Platform Operations