Emerson 4015 Power Supply User Manual


 
IM584000300 Installation Instructions
Issue AB, April 3, 2013 Spec. No. 584000300 (Model 4015-X003)
Page 10 Chapter 2. Installing the System
This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy
Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.
d) Using a hex wrench, raise each leveling feet until the IT rack is resting on the
casters.
8) Position the IT rack.
9) Lower the leveling feet or bolt the IT rack to the floor by using the shipping
brackets (the shipping brackets will have to be re-attached to the IT rack if
removed for rolling the IT rack into position).
INSTALLING INDIVIDUAL SUB-RACKS INTO CUTOMER
PROVIDED IT RACK (not applicable with List R1, R2)
For customer provided IT rack installation only.
Danger: The IT rack must be securely anchored to the floor before the power and
control sub-rack, load distribution sub-rack(s), and battery tray(s) are
installed.
Customer Supplied IT Rack Guidelines
If you plan to assemble / configure your own system, note that the NetSure 4000 Series
components (power and control sub-rack / load distribution sub-rack / battery tray) were
evaluated as a UL Listed system in an Emerson Network Power DCM IT Rack in an
ambient of +35°C (95°F), with a front and rear door free area ratio of 83%.
Installing the Sub-Racks
If the system was ordered to be installed in a customer provided IT rack, install the
individual components of the DC Power System into a 19” mounting frame of the IT rack.
Procedure
Note: Refer to Figure 2-2 as this procedure is performed.
1) If furnished, the DC load distribution sub-rack(s) is typically installed at the top of
the IT rack.
Note: The system can consist of 0-2 DC load distribution sub-rack(s).
a) Slide the DC load distribution sub-rack into position and secure the front
mounting flanges to the IT rack with the furnished cage nuts and screws.
b) Repeat this procedure if a second DC load distribution sub-rack is furnished.
2) The power and control sub-rack is typically installed below the DC load
distribution sub-rack(s).
Note: The system consists of one (1) power and control sub-rack.
a) Secure the rear mounting brackets to the IT rack with the furnished cage nuts
and screws.
b) Remove the rear cover from the power and control sub-rack.
c) Slide the power and control sub-rack into the front of the IT rack until it is in
position (with the bottom of the sub-rack resting on the angles of the rear
mounting brackets).
d) Secure the front mounting flanges to the IT rack with the furnished cage nuts
and screws.