DWBS Installation Checklist
A-2 Issue 5 June 1999
Checklist
The following table is a checklist of tasks for completing a DWBS installation.
Where appropriate, references to the corresponding pages for a description of the
tasks indicated are also provided. Unless otherwise indicated, the page
references are for the DWBS Installation document.
Table A-1. Checklist of Tasks and Corresponding Description Page References for
Completing a DWBS Installation
Task: Have you... Page Yes/No
Wired the CAUs according to the SDSC installation
plan?
3-30
Oriented the CAUs (azimuth and tilt) according to the
SDSC installation plan using brackets when required?
3-49
Wired the WFBs according to the SDSC installation
plan?
3-20
Installed and wired the power supplies for each WFB
that has an attached CAU?
3-21
Verified that the DC power leads for WFB are
“doubled up?”
3-13
Placed the TN789 circuit packs into the appropriate
slots?
3-11
Terminated WFBs 1A and 1B to ports 1 and 2 of the
first TN789 circuit pack?
3-10
Terminated WFBs 2A and 2B to ports 1 and 2 of the
second TN789 circuit pack?
3-10
Terminated all remaining WFBs properly? 3-10
Installed the WT download cable? 4-7
Upgraded the switch software to V5 or greater? 2-1
Enabled wireless capabilities via the Optional
Features form by entering the change
system-parameters customer-options command?
(Remember to log off and log on again.)
2-2
Enabled wireless capabilities via the
Wireless-Related System-Parameters form by
entering the change system-parameters wireless
command?
2-3
Administered the Carrier-Frequencies form? 2-7