Rack Mount Safety Precautions
The following precautions should be followed with regards to rack mount
safety:
Decide on a suitable location for the equipment rack that will hold the
MGC+/ReadiManager unit. It should be situated in a clean, dust-free
area that is well ventilated. Avoid areas where heat, electrical noise and
electromagnetic fields are generated. You will also need it placed near a
grounded power outlet.
Ensure that the leveling jacks on the bottom of the rack are fully
extended to the floor with the full weight of the rack resting on them.
In a single rack installation, stabilizers should be attached to the rack.
In multiple rack installations, the racks should be coupled together.
Always make sure the rack is stable before extending a component from
the rack.
You should extend only one component at a time - extending two or more
simultaneously may cause the rack to become unstable.
Before you install the rails, determine the placement of each component
in the rack.
Install the heaviest server components on the bottom of the rack first, and
then work up.
Allow the power supply units to cool before touching them.
Always keep the rack’s front door and all the blade’s panels and
components closed when not servicing, to maintain proper cooling.
Polycom MGC+/ReadiManagerReadiManager Precautions
The following precautions should be followed with regards to installation of
the ReadiConvene:
Use a regulating uninterruptable power supply (UPS) to protect the MGC+
from power surges and voltage spikes, to keep your MCU and ReadiManager
IAM operating in case of a power failure.