Polycom DOC2238A Network Router User Manual


 
MGC+ Hardware and Installation Manual
2-27
3. Release the clasp locks at the bottom, and lift the MGC+50 top cover.
Figure 2-13: Unpacking the MGC+50
4. Lift the MGC+50 unit and remove the package base.
5. Lower the MGC+50 unit, placing it on the surface.
If you are rack mounting the MGC+50, allow a minimum clearance of 3
inches above the unit.
Foam Block
Foam Block
Wood Packing Case