Xantrex Technology PROsine 2.0 Projector User Manual


 
Configuring a Series System
445-0089-01-01 7–9
Configuring a Series System
Configure each PROsine through its display panel. Refer to “Part 2: Configuration
Menus and Screens” on page 4–4 for an overview of configuration options. Refer
to “Part 3: Configuration Options” on page 4–6 for specific configuration items.
To configure the series system
1. Set up the usual parameters (battery size and type, AC transfer conditions,
etc.) and make sure both PROsines are configured the same.
2. Select one unit to be the “master” and the other to be the “slave”. Configure
AC Series Mode (on the PROsine Advanced menu) as master SP and slave
SP respectively. (SP refers to “Split Phase.”)
Any 120Vac loads that require the fastest possible transfer should be powered
by the “master” unit.
3. If the two PROsines are connected to the same battery bank, configure
Charger Mode (on the Battery menu) to be Primary for the master and
Secondary for the slave. If the two PROsines are connected to separate
battery banks, set Charger Mode to Standalone for both PROsines.
Your system is now ready for operation.