3
Installation
Chapter 3 This section gives complete information for installing a
PROsine system.
Specifically, this section describes:
• Safety instructions and installation codes that must be observed
during installation
• Installation tools and materials
• Appropriate locations and environments for mounting the
PROsine, display panel, and battery temperature sensor
• AC cabling, DC cabling, and grounding information
• Detailed installation procedures on page 3–3.
For information about installing two PROsines in series, see Chapter
7, “Series Operation”.