Avaya S8700 Webcam User Manual


 
Installing and Configuring the Avaya S8700-Series Server January 2008 75
Chapter 8: Installation verification
This chapter provides the following information about how to verify the server installation and
configuration:
Testing the IPSI circuit packs
Testing the license file
Checking LED status indicators
-
Servers
-
Avaya Ethernet switches
-
Uninterruptible power supplies (UPSs)
-
Circuit packs
Testing the IPSI circuit pack
The following steps test the clock and packet interface components within the TN2312BP IPSI
circuit pack.
Note:
Note: With duplicated servers, use the active server.
1. In a SAT command line, type test ipserver-interface UUC and press Enter,
where UUC is the cabinet and the carrier in which the circuit pack is located.
2. Verify that the Test Results screen shows PASS in the Results column.
Testing the license file
!
Important:
Important: Wait at least 30 minutes after you install the Communication Manager license
before you run this test.
Note:
Note: With duplicated servers, use the active server.
1. On a SAT command line, type test license and press Enter.
2. Verify that the Test Results screen shows PASS in the Results column.