9–16 MULTILINK ML1200 MANAGED FIELD SWITCH – INSTRUCTION MANUAL
PORT MIRRORING AND SETUP CHAPTER 9: PORT MIRRORING AND SETUP
See details in Broadcast Storms on page 9–7 to determine the threshold level.
Z After changes are made, do not forget to save the changes using
the save icon ( ).
If the switch is rebooted before the changes are made, the changes
will be lost.