Chapter 1 • Introduction
4
1037753-0001 Revision A
Installation and
commissioning steps
The installation and commissioning of the HN router is a
multi-step process involving two pieces of equipment—the HN
router and the associated transport device. The workflow and
chapter reference numbers for the process steps follow.
1. Preparing, installing, and commissioning the transport device
a. ADTRAN Total Access 600R
– Installing the ADTRAN 600R on page 100
– Connecting the ADTRAN on page 106
– Configuring the ADTRAN on page 107
– Confirming connectivity on page 115
b. Siemens 4100/4101 DSL Modem
– Installation overview on page 118
– Installing the modem on page 119
2. Preparing the router for installation
Chapter 2 on page 5
3. Assembling the HN router
Chapter 3 on page 9
4. Connecting the router to the transport device
Chapter 4 on page 15
5. Commissioning the HN router
Chapter 5 on page 19
6. Verifying the installation, commissioning, and connections
Chapter 6 on page 37
Contact information
If you experience installation problems with the HN Router, first
try the
Diagnostic Utilities on page 51.
For warranty or repair support, the contact information varies
depending on the location. If the customer needs service,
warranty or repair support, they should contact their customer
service representative in accordance with their service agreement.