Hughes HN7700S Network Router User Manual


 
Chapter 6 • Verifying the installation and commissioning
1037753-0001 Revision A
37
Chapter 6
Verifying the installation and
commissioning
This chapter discusses the final steps of the commissioning
process. It covers the following topics:
Verifying the terrestrial link on page 37
Verifying the download status on page 38
Completing the process on page 40
Verifying the terrestrial
link
Use the System Control Center and the Advanced pages to verify
commissioning.
To verify that the Terrestrial Link is successful, use the following
steps to access the Advance Page.
1. Navigate to the Advance Page.
2. Click the General link in the left frame to expand it.
3. Click the Summary link.