Chapter 6 • Verifying the installation and commissioning
40
1037753-0001 Revision A
Completing the process
When you have verified the download is complete and
commissioning of the HN router is successful:
• Perform site sign-off tests.
• Disconnect your laptop from the HN router.
• Connect the customer’s equipment to the router.