Q-Logic 59060-02 B Switch User Manual


 
3 – Event Messages
Critical Events
3-40 59060-02 B
S
(C) (8600.0016) (PortApp) (Online port(s) port_numbers were reset due to disruption during
hot reset.)
Meaning: Some ports were disrupted during hot reset operation due to
events causing disruption.
(C) (8600.0017) (PortApp) (External port license count exceeded, downing external port
port_number)
Meaning: The named external port is down because the number of licensed
external ports has been exceeded.
(C) (8600.0018) (PortApp) (External port license became available, re-starting downed
external ports)
Meaning: An external port that was previously down because of insufficient
port licenses is now online.
(C) (8600.0019) (PortApp) (Internal port license count exceeded, downing internal port
port_number)
Meaning: A device attempted to login to an internal port, but a license was
not available. A license upgrade may be required, or a license may
be release by downing ports.
(C) (8600.001A) (PortApp) (Internal port license became available, re-starting downed
internal ports)
Meaning: A license has become available and ports that had been previously
downed to due to unavailable licenses will be restarted.
(C) (8700.0007) (EPort) (Port: port_number) (Received frame from address not in Access
Control List (ACL) hard zone (src address = FC_address, dest address =
FC_address))
Meaning: The destination for the receive frame is in an ACL zone and the
source is not. The frame will not be forwarded.
(C) (8700.000D) (EPort) (Port: port_number) (Resetting Inter-Switch Link (ISL), a time out
value has been reconfigured.)
Meaning: The Resource Allocation (R_A_TOV) or Error Detect (E_D_TOV)
timeout value has been reconfigured. E_Ports will be automatically
reset to inform the neighbor switch of the change.
(C) (8700.000E) (EPort) (Port: port_number) (InteropCredit value was reconfigured,
resetting port.)
Meaning: The InteropCredit parameter has changed. The affected port will
be automatically reset.