25
3 Preparing the Library
Preparing the library includes the following, which are outlined in this chapter:
• Unpacking the Library
• Selecting an Appropriate Environment for the Library
• Selecting the Mode of Library Operation
• Setting SCSI IDs
• Setting the Library Configuration Switch
• Connecting the SCSI Cables and Terminators
• Connecting the Serial Cable
• Connecting the Library to Fibre Channel
• Connecting the AC Power
Unpacking the Library
The Spectra 10000 library is shipped with the following items:
• Spectra 10000 Library Release Notes
• Spectra 10000 Library User Guide (this guide)
• One Spectra Logic screwdriver
• One AC power cord
• Two SCSI terminators (for SCSI libraries only)
• One front panel filter element
Note: Keep the library’s shipping carton and foam inserts. If the library
needs to be shipped for any reason, it must be packaged in its
original box and packing material for the warranty to remain valid.
See Packing the Library for Shipment on page 89 for information
on the correct way to repackage the library.
See the Spectra Logic Repair Policy on page 106 for information on
returning a library for service.