Spectra Logic 10000 Power Supply User Manual


 
Chapter 6. Maintaining the Library
90
6. Place the top foam cushions over the library (Figure 6-6).
7. Lay the necessary paperwork in the library box.
8. Seal the box with heavy packing tape.
9. Place the shipping label on the box.
Caution: Make sure that you use a shipping company approved by Spectra
Logic. (Contact Spectra Logic Technical Support for
recommendations.)
Figure 6-6 Correct packaging of the library.