Cisco Systems SCE 1000 2xGBE Network Router User Manual


 
Chapter 7 Basic SCE 1000 Platform Operations
Rebooting and Shutting Down the SCE Platform
Cisco SCE 1000 2xGBE Installation and Configuration Guide
OL-7821-05 7-11
Shutting Down the SCE Platform
Shutting down the SCE platform is required before turning the power off. This helps to ensure
that non-volatile memory devices in the SCE platform are properly flushed in an orderly manner.
Note
When the SCE platform restarts, it loads the startup configuration, so all changes made in the running
configuration will be lost. You are advised to save the running configuration before performing reload,
as described in Saving the Configuration Settings (on page 7-5).
To shut down your SCE platform, complete the following steps:
Step 1 Connect to the serial console port (The CON connector on the SCE platform front panel, 9600
baud).
The SCE 1000# prompt appears.
Step 2 Type reload shutdown.
A confirmation message appears.
Step 3 Type Y to confirm the shutdown request and press Enter.
EXAMPLE:
The following example shows the commands for system shutdown.
SCE 1000#reload shutdown
You are about to shut down the system.
The only way to resume system operation after this
is to cycle the power off, and then back on.
Continue?
y
IT IS NOW SAFE TO TURN THE POWER OFF.
Note
Since the SCE platform can recover from the power-down state only by being physically turned off (or
cycling the power), this command can only be executed from the serial CLI console. This limitation
helps prevent situations in which a user issues this command from a Telnet session, and then realizes
he/she has no physical access to the SCE platform.