Cisco Systems SCE 1000 2xGBE Network Router User Manual


 
Cisco SCE 1000 2xGBE Installation and Configuration Guide
OL-7821-05 7-1
This chapter describes how to start up the SCE 1000 platform, reboot, and shutdown. It also
describes how to manage configurations.
This chapter contains the following sections:
Starting the SCE 1000 Platform 7-1
Managing SCE 1000 Configurations 7-4
Performing Complex Configurations 7-7
Displaying the SCE Platform Version Information 7-8
Displaying the SCE Platform Inventory 7-9
Displaying the System Uptime 7-10
Rebooting and Shutting Down the SCE Platform 7-10
Starting the SCE 1000 Platform
The procedures for starting the SCE 1000 platform are explained in the following sections:
Checking Conditions Prior to System Startup (on page 7-1)
Starting the System and Observing Initial Conditions (on page 7-2)
Checking Conditions Prior to System Startup
Check the following conditions before you start your SCE 1000 platform:
Both power supply units are installed and connected
First-time startup at installation:
SCE 1000 platform connected to local console (CON port)
The console terminal is turned on and properly configured
Subsequent startups
Line and Cascade interfaces are properly cabled (optional)
CHAPTER 7
Basic SCE 1000 Platform Operations