Chapter 4 Installation and Maintenance
Power Supply Overview
Cisco SCE 1000 2xGBE Installation and Configuration Guide
OL-7821-05 4-11
The other side of the grounding cable must be connected to the site equivalent of the AC earth.
Figure
4-10: Grounding the Unit (AC)
Figure
4-11: Grounding the Unit (DC)
This completes the procedure for installing the SCE 1000 chassis. Proceed to the next section,
Connecting to the Power Supply, to continue the installation.
Power Supply Overview
The SCE 1000 is available in two power options:
Dual line feed AC power — SCE 1000 is shipped with two appropriate AC power supply
cords.
Dual line feed DC power — requires appropriate cables (hex or loop connectors) (see
Reconnecting DC-Input Power Supply Unit (on page 4-18)).