IBM RS/6000 SP Switch User Manual


 
SPS assembly, placing into service position 3-9
SPS assembly, removing 4-2
SPS assembly, replacing 4-2
SPS assembly, replacing from service position 3-9
SPS fan control cable, removing 4-3
SPS fan control cable, replacing 4-4
SPS fans, removing 4-3
SPS fans, replacing 4-3
SPS front chassis cable 1-8
SPS partitioning 3-8
SPS power card, removing 4-6
SPS power card, replacing 4-7
SPS resources, removing 3-7
SPS resources, restoring 3-7
SPS supervisor card, removing 4-4
SPS supervisor card, replacing 4-5
SPS supervisor power cable, removing 4-5
SPS supervisor power cable, replacing 4-6
SPS Switch data cables 2-13
SPS switch inner chassis cable 1-8
SPS-8 Switch data cables 2-13
SPS, SPS-8 (feature) 5-2, 5-4, 5-6
SPS, SPS-8 switch (feature 5-4
SPS, SPS-8 switch (feature) 5-2, 5-6
SRN (Service Request Number) table for SP Switch
adapters 1-24
static-sensitive devices 4-1
supervisor verification
frame 3-5
node 3-4
switch 3-5
switch adapters (SP Switch), Service Request Number
(SRN) table 1-24
switch assembly from active configuration,
removing 3-7
switch assembly to active configuration, restoring 3-8
switch assembly, removing 4-2
switch assembly, replacing 4-2
switch cables (feature) 5-8
switch clock source, determining the correct 3-6
switch clock source, selecting the 3-6
switch clocks, selecting appropriate 3-6
Switch data cables, SPS 2-13
Switch data cables, SPS-8 2-13
switch fans, removing 4-3
switch fans, replacing 4-3
switch front chassis cable, removing 4-3
switch front chassis cable, replacing 4-4
switch function MAP
flowcharted 1-17
switch inner chassis cable, removing 4-5
switch inner chassis cable, replacing 4-6
switch inner chassis cable, SPS 1-8
switch partitioning 3-8
switch power card, removing 4-6
switch power card, replacing 4-7
switch power MAP
flowcharted 1-13
switch resources, removing 3-7
switch resources, restoring 3-7
switch supervisor card, removing 4-4
switch supervisor card, replacing 4-5
switch supervisor self-test 3-4
switch supervisor verification 3-5
T
tools overview, service 3-1
trademarks A-1
U
unfencing nodes 3-8
updates on SP nodes, installing firmware 3-10
V
verification
frame supervisor 3-5
node supervisor 3-4
switch supervisor 3-5
using Perspectives 3-4
verification and isolation procedures
switch supervisor self-test 3-4
W
who should use book xv
wrap plugs 1-4
Index X-3