Page: 120
Service Guide ML590/ML591
Chapter 3 Maintenance & Disassembly
3.2.28 Front Pressure Roller Assembly
1. Perform these procedures:
3.2.01
3.2.06
3.2.07
3.2.16
3.2.17
3.2.19
3.2.20
3.2.22
3.2.23
3.2.24
3.2.27
2. Separate the arms of the front roller holders (1) and remove the front pressure roller (2).
3. Squeeze the extensions of the front roller holders together and remove the holders.
4. Lift and remove the front pressure springs (3A and 3B).