February 2002 © TOSHIBA TEC 3 - 3 FC-210/310 PREVENTIVE MAINTENANCE
General Maintenance Checklist
1. Developer material 40/60 *8
2. Doctor blade (40/60) *1 Developer K
3. Developer unit drum seal (40/60) *9 counter
4. Front/rear sides of developer unit (40/60) *2 (08-847)
5. Oil seal portion AV
6. Drum cleaning blade 40/60 *3
<P23-I13>
7. Recovery blade (40/60) *4
Processing 8. Felt seals on both ends (40/60)
unit (EPU) of the cleaning blade
9. Entire developer/cleaner unit (40/60) *7
(Only Black
10. Main charger case (40/60) *6 Drum K
related parts)
11.Discharge LED (40/60) life counter
12. Wire cleaning pad 40/60 <P22-I16> (08-843)
13. Main charger wire 40/60 *6
<P22-I15> Note:
14. Main charger grid 40/60 <P22-I24> Clear "Drum
15. Main charger contact (40/60) K drive cou-
16.Drum 40/60
ch.3.6.2 nter(08-870)"
<P22-I38> when drum
17. Drum shaft (40/60) has been
18. Drum thermistor (40/60) replaced.
19. Toner recovery auger drive (40/60) W
20. Toner cartridge drive gear W
21. Ozone filter 40/60 *5
Around EPU <P6-I37>
area 22.Toner bag 40/60 Key-operator’s
item
<P33-I33>
23. Fuser belt 40/60 ch.3.6.6
<P28-I24>
24. Upper heat roller A (40/60)
25. Fuser roller 40/60 ch.3.6.5
<P28-I17> Fuser unit
Fuser unit 26.Lower heat roller 40/60 ch.3.6.6 counter
<P27-I14> (08-854)
27. Belt guide 40/60 <P28-I16>
28.Separation guide A (40/60)
29.Separation fingers 40/60 *10
<P28-I28>
30. Oil roller 40/60 ch.3.6.7
<P28-I44>
Cleaning Lubri-
Replace- Opera-
Remarks Reference
Section Item to inspect
(X 1000) cation
ment tion
<P-I> counter
(X 1000) check