Acer Altos G900 Personal Computer User Manual


 
147
System rack installation
The Altos G900 server system is available in both rack-mount and tower
configuration. A rack mount kit is available for customers who want to
convert a tower-mounted system to rack-model design. To purchase a
rack mount kit, contact your local Acer representative or order directly
from www.acer.com.tw
.
The figure below shows the Altos G900 server in a rack-mount and
tower position.
Important: When installing or removing the server from the
rack, use an appropriate mechanical assist unit to lift and move
the server.
Rack-mount kit contents
The rack conversion kit for the Altos G900 server platform contains the
following items:
Rack bezel and keys
Rack handle kit (handles and screws)
Rack-mount position
Tower position
Figure 58 - Server orientation
AA G900 ug - EN.book Page 147 Wednesday, September 25, 2002 5:23 PM