Chapter 2
Preparing for Installation
Topics:
• Unpacking the Appliance
• Preparing the Site and Rack
• Cautions and Warnings
Before you install your new appliance, carefully unpack your
appliance and make sure that all parts were delivered. Once
you are satisfied that your appliance has been delivered to
your expectations, verify that the location where the
appliance will be installed meets temperature and power
requirements and that the server cabinet or floor-to-ceiling
cabinet is securely bolted to the floor and has sufficient
airflow.
Only trained and qualified personnel should install, maintain,
or replace the appliance, and efforts should be taken to
ensure that all cautions and warnings are followed.
69