Chapter 3
Installing the Hardware
Topics:
• Rack Mounting the Appliance
• Installing and Removing 1G
SFP Transceivers
• Installing and Removing XFP
and 10G SFP+ Transceivers
• Connecting the Cables
• Switching on the Appliance
After you have determined that the location where you will
install your appliance meets the environmental standards and
the server rack is in place according to the instructions, you
are ready to install the hardware. After you mount the
appliance, you are ready to connect it to the network, to a
power source, and to the console terminal that you will use
for initial configuration. To complete the installation, you turn
on the appliance. Be sure to observe the cautions and
warnings listed with the installation instructions.
75