Sun Microsystems SL8500 Computer Drive User Manual


 
Robotics Interface Module
10 StreamLine™ SL8500 Modular Library System User's Guide March 2007 Revision K 96154
Redundant HandBots
Make sure that the service representative completes the following are prerequisite to
the operation of the redundant HandBots (two HandBots per rail):
1. Install the Service Safety Door
2. Upgrade the HandBot assemblies
3. Upgrade the library firmware (FRS 2.50 or later)
4. Upgrade the HBS assemblies; these have an “X” on the upper left of the assembly
5. Upgrade the HBN card
6. HBQ rail terminator cards
7. ENDSTOP bar code inserts in the 3-cell arrays at the ends of all rails
8. Additional DC power supplies
Initialization
When power is applied to the library, each HandBot begins its initialization routine.
The sequence for initialization is in the following order:
FIGURE 1-4 HandBot on the Power Rail)