Fujitsu M9000 Server User Manual


 
Chapter 13 PCI Slot Device Replacement 13-21
2. Change the mode switch setting on the OPNL from the Locked position to the
Service position.
Note – When the maintenance work is completed, be sure to confirm the mode
switch setting and return the switch to Locked.
3. Stop (turn off power) all domains together. Take either of the following two
actions:
Press and hold the POWER switch on the operator panel for at least four
seconds.
From a console that is connected to XSCF, log in to XSCF, and execute the
poweroff -a command.
The OS shutdown processing is executed for all the domains, and then the
power-off processing is executed.
4. Confirm that the power-off processing is completed by confirming that the
POWER LED (green) on the PCI card is off.
5. Switch off all main line switches for the AC section (ACS) in the power supply
system.
For details, see Section 4.5.3, “Main Line Switch Locations” on page 4-27.
Note – If the optional three-phase 200 VAC input power supply unit is installed, the
main line switches are located on the three-phase ACS.
Caution – If the dual power feed option is installed, switch off the main line
switches for both power supply units.
Caution – After stopping all the domains, be sure to switch off the main line
switches in the power supply system to completely shut off the supply of power.
6. Connect the clip of the antistatic wrist strap and of the antistatic mat to the
server grounding port. See Section 1.4, “Antistatic Precautions” on page 1-6.