Chapter 3: Site Preparation
For the NCR 7870 to operate efficiently and safely, the selected
installation site must meet certain requirements. Ensuring that these
conditions are met and maintained will protect the 7870 from
unnecessary wear and potential damage as well as easing installation.
This chapter covers
•
Getting Started
•
About Site Preparation
•
Customer Responsibilities
•
Environmental Requirements
•
Checkstand Power and Wiring Considerations
•
Checkstand Considerations
•
Cable Lengths and Hole Sizes
•
7870 Dimensions