NCR 7870 Scanner User Manual


 
Chapter 3: Site Preparation
For the NCR 7870 to operate efficiently and safely, the selected
installation site must meet certain requirements. Ensuring that these
conditions are met and maintained will protect the 7870 from
unnecessary wear and potential damage as well as easing installation.
This chapter covers
Getting Started
About Site Preparation
Customer Responsibilities
Environmental Requirements
Checkstand Power and Wiring Considerations
Checkstand Considerations
Cable Lengths and Hole Sizes
7870 Dimensions