Cisco Systems CRS-1 Network Router User Manual


 
4-30
Cisco CRS-1 Carrier Routing System 8-Slot Line Card Chassis Installation Guide
OL-6256-08
Chapter 4 Installing and Removing MSCs, PLIMs, and Associated Components
How to Install or Remove an MSC
3. Examine the alarm LEDs on the RP to see if there are any active alarm conditions.
4. Examine the power shelves to see whether the chassis, as a whole, is receiving power.
Switch Fabric Card Status LEDs
Use the status LEDs, located on the switch fabric card faceplate, to verify the correct installation of the
card:
When the card is properly installed, the Status turns green. If this LED is off, verify that the card is
installed correctly.
When the Status is blinking yellow, a problem exists on the board.
When the Status is off, the board state is unknown. Verify that there is power to the board by looking
at the indicators on the power module.
If there is a failure during the board boot sequence, the two-row, four-character alphanumeric
display indicates the current boot phase to assist you in debugging the board failure.
How to Install or Remove an MSC
This section contains the following procedures:
Installing an MSC
Removing an MSC
Verifying the Installation of an MSC
Installing an MSC
This section describes how to install an MSC in the Cisco CRS-1 8-slot line card chassis. For more
detailed information on the MSC, see Cisco CRS-1 Carrier Routing System 8-Slot Line Card Chassis
System Description.
The MSC is a Layer 3 forwarding engine in the Cisco CRS-1 Series routing system (see Figure 4-23).
An MSC can be paired with different types of physical layer interface modules (PLIMs) to provide a
variety of interfaces.
There are two versions of the MSC: The original version (CRS-MSC) and Version B (CRS-MSC-B).
Both versions of the card provide the same functionality.
An MSC fits into any available MSC slot and connects directly to the midplane. If you install a new