Fujitsu T5220 Server User Manual


 
Servicing Boards and Components 159
FIGURE: Installing a Front Control Panel Light Pipe Assembly in a SPARC Enterprise
T5220 Server
3. Secure the light pipe assembly with the No. 1 Phillips screws.
Two screws secure the assembly to the hard drive cage in the SPARC Enterprise
T5120 server.
Three screws secure the assembly to the hard drive cage in the SPARC
Enterprise T5220 server.
4. Install the hard drive cage.
See “Install the Hard Drive Cage” on page 149.
Related Information
“Remove the Front Control Panel Light Pipe Assemblies” on page 157