MGE UPS Systems 225KVA Power Supply User Manual


 
Installation and User Manual
Start-up
Following servicing, proceed in the following order: (see Figure 5-5)
1. Close switches Q5N on the UPS units.
2. Close switch Q5N in the external bypass unit.
3. Open switch Q3BP in the parallel-connection unit.
4. Close switches Q1 and QF1 on the UPS units.
5. Start the inverters (press the "inverter ON" buttons 7 ).
Figure 5-5: Start-up Procedure After Isolation Diagram.
Figure 5-6: Redundancy for Increased Output Diagram.