NETGEAR EDA 500 Switch User Manual


 
Backup and Recovery
247
ReadyNAS OS 6.1
8. From the pop-up menu that displays, select Settings.
A pop-up screen displays.
9. Click the Schedule tab.
10. Clear the Enabled check box.
Clearing this check box forces the recovery procedure to be started manually, which
ensures that the recovery job does not happen automatically
.
WARNING:
To ensure the integrity of the data stored on your primary device,
never schedule a recovery job to run automatically.
11. Click the Apply button.
Your changes are saved.
12. Click the OK button.
The pop-up screen closes.
13. Configure the recovery job as described in Configure a Backup or Recovery Job on
page 248.