Installing the network cables 35
Model 6511RC User Manual 2 • Hardware installation
6. Insert the front blade into the front chassis slot corresponding to the slot in which you installed the rear
blade. Verify that the release buttons in the handles click up to indicate that the board is fully seated and
locked into place.
Installing the network cables
This section describes installing network interface cables on the following front and rear Matrix Switch
blade ports:
• The Matrix Switch front blade’s 10/100 Ethernet LAN port and an EIA 561 RS-232 CONFIG port
(see figure 13).
• The Matrix Switch rear blade’s STM-1 SDH WAN port (presented in SC optical and 75-ohm BNC electri-
cal formats) and two 10/100/100 Ethernet WAN/LAN management ports (see figure 14)
Figure 13. Matrix Switch front blade network interface ports
Figure 14. Matrix Switch rear blade network interface ports