Polycom MGC-50/MGC-100 Network Router User Manual


 
MGC Hardware and Installation Manual
2-3
3. Release the clasp locks at the bottom, and lift the MGC-100 top cover.
Figure 2-2: Unpacking the MGC-100
4. Lift the MGC-100 unit and remove the packaging material.
5. Lower the MGC-100 unit, placing it on the surface.
If the MGC-100 is a standalone unit, place it on a flat surface. If you are
rack mounting the MGC-100, allow a minimum clearance of 3” above
the unit. If you are rack mounting the NEBS MGC-100, the 3” above the
unit is not needed. Refer to the NEBS Standards for clearance
compliance.
Foam Block
Foam Block
Wood Packing
C
ase