Agilent Technologies 01664-97005 Switch User Manual


 
To check the power-up tests
The logic analyzer automatically performs power-up tests when you apply power to the
instrument (during the boot-up sequence). The revision number of the operating system
shows in the upper-right corner of the screen during these power-up tests. As each test
completes, either "passed" or "failed" prints on the screen in front of the name of each test.
1
Disconnect all inputs, then insert the operating system disk into the disk drive.
2 Let the instrument warm up for a few minutes, then cycle power by turning off then
turning on the power switch.
If the instrument is not warmed up, the power-up test screen will complete before you can
view the screen.
3
As the tests complete, check if they pass or fail.
Performing Power-Up Self-Tests
passed ROM text
passed RAM test
passed Interrupt test
passed Display test
passed HIL Controller test
passed HIL Devices test
No Disk Front Disk test
Troubleshooting
To check the power-up tests
5–15