Avaya X330WAN Network Router User Manual


 
Installing an X330WAN Module into an Avaya P330 Switch
Avaya X330WAN User’s Guide 11
5 Follow the post-installation checks, as described in "Power On Self Test" on
page 11.
Power On Self Test
When you power up the Avaya P330 switch with a X330WAN module inserted,
both the P330 switch and the X330WAN perform a self test. This test takes about 40
seconds to complete, and includes:
Checksum tests of boot and system areas of Flash memory
System memory tests
MAC address verification test
System timer test
CAM (Contents Addressable Memory) tests
Console Port tests
Internal packet forwarding tests
Switch and expansion module ASIC (Application Specific Integrated Circuit)
tests
Switch and expansion module ASIC memory tests
Expansion module interface tests
Expansion module packet forwarding tests
After you insert an X330WAN access router module into a powered P330 switch,
causing a reset, or after a power cycle of the host P330 switch, the X330W-2DS1
startup sequence is as follows:
1 Initially all LEDs light for 15 seconds and then switch off.
2 The ALM LEDs light for 15 seconds and then switch off.
3 The TST LEDs lights for 15 seconds and then switch off.
4 At this point, the ALM LED lights again if there is no line signal detected on the
E1/T1 ports. If a signal is detected on the line, the SIG LEDs light and the ALM
LEDs switch off.
The X330W-2USP startup sequence is as follows:
1 All LEDs light for 15 seconds, then switch off.
2 All LEDs remain off for 15 seconds.
3 The OPR LED lights and remains on.
Note: LED Number 51 on the Avaya P330 switch should be ON during the self-test
procedure.
The X330WAN module must be inserted completely for the P330 switch to
successfully reset.