7.15.2.4.4. Change the task display order
Drag the task/interrupt routine to be moved (the left portion of the graph) to the destination.
To initialize the display order, select Menu - [Init Order].
7.15.2.4.5. Display the specific task only
Click the task/interrupt routine to be hidden (the left portion of the graph). Every time you click, the
setting is switched between "Display" and "Hide".
7.15.2.4.6. Change the display color
Select Menu - [Color...]. The Color dialog is opened.
Click the button corresponding to the desired item. The Color Setting dialog is opened. Change the
display color in the dialog.
216