CONTENTS
II
ETC00303(1) BINOS E e (2.0) 11/00
Rosemount Analytical
OPERATION (STARTUP)
5. Installation and Preparation of Startup 5 - 1
5.1 Installation Site 5 - 2
5.2 (vacant) 5 - 3
5.2.1 Pressure Sensor (Option) 5 - 4
5.2.4 Gas Flow 5 - 4
5.3 Gas Connections 5 - 5
6. Startup Procedue (Switching On) 6 - 1
6.1 Supply Voltage 6 - 2
7. Measurement / Calibration / Switching (Shut) Off 7 - 1
7.1 Measurement 7 - 1
7.2 Calibration 7 - 2
7.2.1 Calibration (Test) Gases 7 - 2
7.3 Switching (Shut) Off 7 - 4
8. BINOS E Front Panel Program 8 - 1
8.1 Requirements 8 - 1
8.2 Installation and Startup 8 - 2
8.2.1 Installation 8 - 2
8.2.2 Startup 8 - 4
8.3 Function Keys 8 - 4
8.4 Status Display ("Status") 8 - 10
8.5 Display Page 8 - 11
8.6 Recorder Page 8 - 14
8.6.1 Averaging 8 - 15
8.6.2 Spooling 8 - 15
8.6.3 Recording 8 - 15
8.7 Messages Page 8 - 16
8.8 Analog Output Link and Adjustment Page 8 - 18
9. BINOS E Data Exchange 9 - 1