MEASUREMENT/CALIBRATION/SWITCHING (SHUT) OFF
90002929(6) NGA-MLT e 30.10.99
Rosemount Analytical
SWITCHING (SHUT) OFF
Be sure to observe the safety regulations for the respective gases
(sample gas and test gases / span gases) and the gas bottles !
Pressure of sample gas / test gases normally max. 1,500 hPa !
7.3 Switching (Shut) Off
Before switching off the analyzer, we recommend first purging all the gas lines for about 5
minutes with zeroing gas (N
2
) or adequate conditioned air. The full procedure for shutting off
is as follows:
All analyzers with electrochemical O
2
cell have to be purged with conditioned
ambient air prior to disconnect the gas lines !
Then the gas line fittings have to be closed for transport or depositing analyzer.
Admit zeroing gas at the respective gas inlet fitting.
Set the gas flow to permissible rate.
After 5 minutes have elapsed:
Switch off by disconnecting the voltage supply.
Shut Off the gas supply.
Disconnect gas lines.
Close all gas line fittings immediately.