GE GFK-1004B Network Router User Manual


 
5
5-14 TCP/IP Ethernet Communications User’s Manual – January 1996
GFK-1004B
Table 5-5. Field Network Test Utility Commands
Command Restrictions
bps
chbps
chdate (Not recommended if the PLC CPU is configured properly.)
chsosw (Not recommended if the PLC CPU is configured properly.)
chtime (Not recommended if the PLC CPU is configured properly.)
clear Limited to clear tally, clear log, clear heap, and clear exs.
clsosw (Not recommended if the PLC CPU is configured properly.)
date
help or ?
load
log
login
net
node
ok
rem
report
restart
show Only task identifiers “b”, “c”, and “l” are supported.
sosw
stopt
stat Only task identifiers “b”, “c ”, and “l” are supported
tally Only task identifiers “b”, “c”, and “l” are supported
test
time
Monitor Commands are not in italics.
Modify Commands are shown in italics.
The Field Network Test utility is exited by restarting the Ethernet Interface. This can be
accomplished by entering the RESTART or LOAD commands, pressing the Ethernet In-
terface Restart button, or by cycling power on the Series 90-70 PLC.