Gateway 9415 Server User Manual


 
50
www.gateway.com
Installing the power supply air duct
To install the power supply air duct:
1 Place the power supply air duct into the chassis over the power supply fan module
and in front of the back power supply (between the power supplies if the second power
supply is installed).
2 Tighten the mounting screw to hold the power supply air duct in place.
3 Rearrange cables as they were prior to removal of the air duct.
4 Follow the instructions in “Closing the server case” on page 44.
Caution To ensure continued, reliable operation, always operate your server
with the appropriate air ducts and air dams in place. Failure to do
this could result in equipment damage.
Caution Make sure you do not pinch any cables under the air duct as you
are reinstalling it. Failure to do this could result in misalignment of
the duct and incorrect airflow in the server.
8510522.book Page 50 Wednesday, March 16, 2005 11:19 AM